Preliminaries Estimating

Site establishment, supervision, plant and time-related costs built from your programme

Preliminaries are the cost of running the job rather than building it: site sheds, supervision, cranes, hoists, scaffold, temporary power and water, insurances and approvals. On a commercial tender they can run to 10 or 15 per cent of the contract price, and they are the line most often copied from the last job.

We build preliminaries from your programme and the contract conditions, splitting fixed and time-related items, so the number moves correctly when the programme does. It is the 00 PR element in an NPWC cost plan and the Preliminaries section in the ASMM / ANZSMM.

Site establishment on a building project
24 to 48 hoursStandard scope turnaround
Time-relatedPriced by the week
Fixed itemsPriced once
Programme-drivenMoves when time moves
00 PRNPWC element
Deliverables

What You Actually Receive

DeliverableFormatDetail level
Site establishmentExcel, itemSheds, fencing, hoardings, amenities and signage
Supervision and managementExcel, weeksProject manager, site manager, foreman and support
Plant and accessExcel, weeksCranes, hoists, scaffold and EWPs
Temporary servicesExcel, weeksPower, water, sanitation and waste
Insurances and approvalsExcel, itemContract works, public liability and permits
Priced estimateExcel + PDFFixed and time-related totals with GST shown separately
Australian Framework

How This Work Fits Into the Australian Standards

Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.

Trade section (ASMM / ANZSMM)Element (NPWC / AIQS)
Preliminaries00 PR Preliminaries
Scope Coverage

Preliminaries Work We Measure

Everything it costs to run the site.

Site establishment

  • Site sheds and amenities
  • Fencing and hoardings
  • Signage and security
  • Traffic management

Supervision

  • Project and site management
  • Contract administration
  • Safety and quality staff
  • Surveying and setting out

Plant & access

  • Tower and mobile cranes
  • Hoists and lifts
  • Scaffold and edge protection
  • Waste bins and cleaning

Temporary works

  • Temporary power and water
  • Temporary fencing and propping
  • Dewatering
  • Protection of existing structures

Insurance & approvals

  • Contract works insurance
  • Public liability
  • Council fees and permits
  • Long service leave levies
Our Process

How We Prepare Your Estimate

Five steps from your drawings to a preliminaries number you can defend in a scope review.

Start a Project →
  1. 01

    Scope review

    An estimator reads the tender documents, contract conditions, programme and the project preliminaries and general requirements before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.

  2. 02

    Digital measurement

    Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: weeks of supervision and plant, numbers of facilities, and lump-sum items such as insurances and approvals. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.

  3. 03

    Pricing

    We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.

  4. 04

    Senior QA review

    Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.

  5. 05

    Delivery

    Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.

Tooling

Software We Work In

You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.

Bluebeam Revu

Measuring, marking and comparing drawings on screen.

PlanSwift

Takeoffs made from ready-built assemblies, with quantities you can export.

On-Screen Takeoff

Layer-based measuring on big commercial drawing sets.

Rawlinsons-benchmarked rates

Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.

Microsoft Excel

The final file, set out to match your cost codes and trade sections.

If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.

Turnaround & Pricing

Cost and Delivery Time

We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.

Small / residential scope

24 hours

Small projects up to a few months.

Typical fee A$350 to A$850

Mid-size commercial

24 to 48 hours

Commercial projects of 6 to 18 months.

Typical fee A$850 to A$1,800

Large / complex

48 to 72 hours

Multi-year and multi-stage projects.

Typical fee A$1,800 to A$3,600

Monthly takeoff package

Ongoing

A set number of estimates every month, with your jobs placed first in the queue.

Flat monthly rate from A$2,200/mo

Estimators reviewing project drawings
Cost vs. Capacity

Why Builders Hand Preliminaries Estimating to Us

A full-time estimator is a salary, super, software seats and training. A preliminaries takeoff from us is a per-project cost that only appears when you are actually tendering.

  • No software licences. Takeoff and cost-data subscriptions cost thousands of dollars per user each year. With us, you use ours.
  • Tender more, more selectively. Most builders do not lose jobs through bad pricing. They lose them because they run out of time to reach enough tenders before closing.
  • Site time stays site time. Items get overlooked when estimating at 9pm after a long day on site.
  • Independent accuracy check. Even builders with in-house estimators use us to sanity-check large or unfamiliar preliminaries scopes before they submit.
  • Moves up and down with how busy you are. Five takeoffs in a busy month and none in a slow one. You never carry a fixed cost.
Who We Work With

Made for Anyone Pricing Preliminaries

Head contractors

Programme-based preliminaries.

Project managers

Budget and variation costs.

Developers

Early cost plans.

Quantity surveyors

Element 00 PR costs.

Subcontractors

Subcontract attendance costs.

Insurers

Cost-to-complete checks.

Sample Output

Sample Line Items

Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.

ItemUnitQtyMaterialLabourTotal
Site sheds and amenitiesweek52$$$
Project managerweek52$$$
Site managerweek52$$$
Tower craneweek30$$$
Scaffold hirem²2,400.0$$$
Waste binsNo.40$$$

These example items show only the layout and units. They do not come from a client project.

FAQ

Common Questions

How are preliminaries calculated?

From your programme: time-related items are priced per week against the duration, and fixed items once. If the programme changes, the preliminaries change with it.

Do you split fixed and time-related items?

Yes. That is the key to pricing variations and extensions of time correctly.

Can you review preliminaries on a tender I already have?

Yes, we compare them to the programme and flag items that look high, low or missing.

Do you cover contractors’ margin?

Margin is shown separately so you can set your own.

Which states and territories do you cover?

Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.

What does it cost?

A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.

How fast is turnaround?

Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.

Are my project details kept confidential?

Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.

Ready to Get Started?

Ready for Your Next Preliminaries Tender?

Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.

↑