Site establishment
- Site sheds and amenities
- Fencing and hoardings
- Signage and security
- Traffic management
Site establishment, supervision, plant and time-related costs built from your programme
Preliminaries are the cost of running the job rather than building it: site sheds, supervision, cranes, hoists, scaffold, temporary power and water, insurances and approvals. On a commercial tender they can run to 10 or 15 per cent of the contract price, and they are the line most often copied from the last job.
We build preliminaries from your programme and the contract conditions, splitting fixed and time-related items, so the number moves correctly when the programme does. It is the 00 PR element in an NPWC cost plan and the Preliminaries section in the ASMM / ANZSMM.
| Deliverable | Format | Detail level |
|---|---|---|
| Site establishment | Excel, item | Sheds, fencing, hoardings, amenities and signage |
| Supervision and management | Excel, weeks | Project manager, site manager, foreman and support |
| Plant and access | Excel, weeks | Cranes, hoists, scaffold and EWPs |
| Temporary services | Excel, weeks | Power, water, sanitation and waste |
| Insurances and approvals | Excel, item | Contract works, public liability and permits |
| Priced estimate | Excel + PDF | Fixed and time-related totals with GST shown separately |
Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.
| Trade section (ASMM / ANZSMM) | Element (NPWC / AIQS) |
|---|---|
| Preliminaries | 00 PR Preliminaries |
Everything it costs to run the site.
Five steps from your drawings to a preliminaries number you can defend in a scope review.
An estimator reads the tender documents, contract conditions, programme and the project preliminaries and general requirements before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: weeks of supervision and plant, numbers of facilities, and lump-sum items such as insurances and approvals. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
Small projects up to a few months.
Typical fee A$350 to A$850
Commercial projects of 6 to 18 months.
Typical fee A$850 to A$1,800
Multi-year and multi-stage projects.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A preliminaries takeoff from us is a per-project cost that only appears when you are actually tendering.
Programme-based preliminaries.
Budget and variation costs.
Early cost plans.
Element 00 PR costs.
Subcontract attendance costs.
Cost-to-complete checks.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| Site sheds and amenities | week | 52 | $ | $ | $ |
| Project manager | week | 52 | $ | $ | $ |
| Site manager | week | 52 | $ | $ | $ |
| Tower crane | week | 30 | $ | $ | $ |
| Scaffold hire | m² | 2,400.0 | $ | $ | $ |
| Waste bins | No. | 40 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
From your programme: time-related items are priced per week against the duration, and fixed items once. If the programme changes, the preliminaries change with it.
Yes. That is the key to pricing variations and extensions of time correctly.
Yes, we compare them to the programme and flag items that look high, low or missing.
Margin is shown separately so you can set your own.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.