Furniture & fittings
- Loose furniture
- Fixed seating
- Window furnishings
- Signage and wayfinding
Furniture, fittings, commercial equipment and specialist works counted and priced from one schedule
FF&E and specialist works are the items that do not fit a standard trade: commercial kitchens, laboratory fit-out, cool rooms, stage equipment, library shelving, signage, and bespoke fabrication. They are priced by schedule and supplier quote, and they are often left as a lump sum until the last minute.
We build the schedule from the drawings and data sheets, count every item, add delivery, installation and builder’s work in connection, and return an estimate matched to Special Equipment (16 SE) in the NPWC.
| Deliverable | Format | Detail level |
|---|---|---|
| FF&E schedule | Excel, No. | Furniture, equipment and fittings by room |
| Specialist equipment | Excel, No. | Kitchens, laboratories, cool rooms and stage |
| Builder’s work in connection | Excel | Plinths, services connections and structural support |
| Delivery and installation | Excel, hrs | Freight, handling and fit-off |
| Specialist fabrication | Excel, t / m² | Bespoke metalwork, screens and features |
| Priced estimate | Excel + PDF | Supply and installation, with GST on its own line |
Every estimate is structured to the trade sections used for tendering and to the elements used for early cost plans, so one set of quantities serves both.
| Trade section (ASMM / ANZSMM) | Element (NPWC / AIQS) |
|---|---|
| FF&E / Commercial Equipment | 16 SE Special Equipment |
| Structural Steel / Specialist Works | 16 SE Special Equipment |
The items that sit between the trades.
Five steps from your drawings to a FF&E and specialist works number you can defend in a scope review.
An estimator reads the FF&E schedule, equipment layouts, specialist drawings and the manufacturer data sheets before touching a takeoff tool, and lists every assumption, exclusion and missing item as a query for you to confirm. Nothing is priced on a guess.
Quantities are measured digitally in Bluebeam Revu, PlanSwift or On-Screen Takeoff, in metric: numbers of furniture and equipment by item, square metres of specialist surfaces and lineal metres of installations. Each measurement sits on a named layer, so the marked-up PDF you receive is a visual audit trail.
We price the quantities using current Australian supplier quotes, subcontract rates and published benchmarks such as Rawlinsons, adjusted for your postcode and state. If you give us your own rates or a preferred supplier schedule, we use those.
Before anything is sent, a second estimator compares the takeoff with the drawings and verifies the measuring rules, deductions, wastage allowances and productivity assumptions.
Excel and PDF files reach your inbox within one to two days for standard jobs. One round of changes is included, and we remain available for tender queries and scope questions after the tender.
You do not have to hold a licence for these tools. We do the measuring with them and hand over the results.
Measuring, marking and comparing drawings on screen.
Takeoffs made from ready-built assemblies, with quantities you can export.
Layer-based measuring on big commercial drawing sets.
Up-to-date Australian unit rates, compared with supplier and subcontractor quotes.
The final file, set out to match your cost codes and trade sections.
If you use Buildsoft, CostX, Estimate One, Procore or your own template, let us know and we will prepare the file so it imports straight in.
We quote a fee for each project before starting, in AUD excluding GST. We never bill by the hour, and you are never charged more than the quote.
Small cafes, shops and clinics.
Typical fee A$350 to A$850
Commercial fit-outs and schools.
Typical fee A$850 to A$1,800
Hospitals, universities and large developments.
Typical fee A$1,800 to A$3,600
A set number of estimates every month, with your jobs placed first in the queue.
Flat monthly rate from A$2,200/mo
A full-time estimator is a salary, super, software seats and training. A FF&E and specialist works takeoff from us is a per-project cost that only appears when you are actually tendering.
Schedule takeoffs.
Equipment and fit-out packages.
FF&E budgets.
Equipment cost plans.
Item and quantity lists.
Budget tracking.
Every estimate has this much detail: quantities tied to elements and measured in metric, never lump sums.
| Item | Unit | Qty | Material | Labour | Total |
|---|---|---|---|---|---|
| Commercial kitchen equipment package | item | 1 | $ | $ | $ |
| Stainless steel benches | m | 24.0 | $ | $ | $ |
| Cool room, 12 m² | No. | 1 | $ | $ | $ |
| Library shelving | m | 86.0 | $ | $ | $ |
| Signage package | item | 1 | $ | $ | $ |
These example items show only the layout and units. They do not come from a client project.
Furniture, fixtures and equipment: items that are not part of the building structure but are needed to use it.
Where supplied. Otherwise we use benchmark rates and flag them as allowances.
Yes, as a separate line.
Yes, by weight or area depending on how it is priced.
Every one. Prices are set for your project postcode and state, so a job in Darwin and a job in Melbourne get their own unit costs instead of one national average.
A fee is quoted per project, in AUD excluding GST, before any work starts. You approve it in writing first. There is no hourly billing and no invoice larger than the quote.
Standard scopes ship in 24 to 48 hours. Large packages take 48 to 72 hours. If you are against a closing time, say so when you upload and we will tell you honestly whether we can meet it.
Yes. We keep drawings, specifications and tender figures private, and if you prefer we will sign your NDA before we receive any documents.
Send your drawings along with a short note on what the job covers. A fee and delivery date come back the same working day, and the finished estimate follows within one to two days of your approval.